| Sign In | Join Free | My insurersguide.com |
|
Brand Name : ZNLS
Model Number : TN
Place of Origin : China
MOQ : 25 tons
Price : Negotiation
Payment Terms : 30%TT, Balance against copy of BL
Supply Ability : 400 to 500 tons per month
Delivery Time : 14 to 21 days after deposit
Packaging Details : In bundle or pallets, or by customer demands
Material : Steel
Surface Treatment : Powder Coated
Face panel : Steel plate
Size : Modular size or Specific project design
Outstanding feature : One time monolithic pouring
Striking and lifting : Form panel and supporting as a unit
Tunnel formwork - Strong and effective steel form allowing slabs and walls in one pour
Overview
Tunnel formwork system is a modular and systemized system with high efficience. Applying the design concept of industrial production, this system is more suitable and ecnomical for buildings with similar floor layouts, particularly highrise condominiums with multiple rooms of similar structure as standard bays and depth.
Characteristic
1 . Shorten cycle times: Casting of walls and slabs in one operation, construction period will be reduced a lot.
2 . Versatile and adaptable: All ZNLS components are compatible with this system to deliver different construction requirments,.
3 . Modular and adjustable : Vertical, horizental and back panels are standard module. Telescopic pull push prop and extension filler panels make it well adjusted to non-typical floors, even to different projects.
4 . Easy striking and reposition : Due to unique roller mechanism, tunnel form can be moved without effort.
5 . Good integrity : The connections are strong and resonable, thus the unit can be lifted as a whole.
Value-added Service
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.

|
|
Easy Striking Tunnel Formwork System Good Integrity Shorten Cycle Times Images |